…— Well, look, we've got this space for you — 45 square meters — and over there by the warehouse there's a bigger one, about 200, and probably another one somewhere… a hundred-something. But that one still needs heating put in. There's also a great hall on the second floor, nice flat floor and enormous windows, but how would you haul everything up there?
— Does this one have heating?
— Yeah, everything's fine here. There used to be a directors' canteen in this room. A couple years ago there were rats running along the pipe, but now the holes are patched, they don't come in… Mice sometimes… But they won't touch your books and plywood: there are sacks of grain on the other side of the wall, they're well fed. Only — look — the door's narrow, ninety centimeters. What's the width on that machine of yours?
— A meter forty.
— Hmm… And how tall?
— A meter twenty if you unscrew the legs, and then there's a bit more on top…
— Well then it'll fit through the window.

— Through the window?!

The windows here are enormous, tall — and the walls must be nearly a meter thick. A pre-revolutionary factory.

— Yep. We'll turn it on its side, lay down some planks at an angle and it'll roll right in. The window, look, is exactly one twenty-five wide and two meters tall. How much does the machine weigh?
— Four hundred kilos.
— We'll manage somehow… Or we can widen the door, if you like.
— The door?! How?! There's a mosaic on that wall!
— True, but it's on panels, you can shift them. Let's go take a look.
We stand for a few seconds staring at the door, a mosaic honor board to its left and a mosaic Lenin looking at us anxiously from the right.
— Yeah, we could widen the door, if the director gives the go-ahead. Though then we'd have to widen the lobby door too… Maybe the window is better?
— Probably, yes… And how do we get it back out if we need to?
— Same way. We'll take apart the sill, all of that, pull out the frame, then foam it back. Don't worry, it'll all work out fine.

…

And that's how nalichnik kit production begins. :)

Meanwhile I've finished the first assembly instruction — for the "Ulan-Ude" nalichnik. It came out to 48 pages, which is no small thing. But everything is laid out clearly, step by step. The second one — "Dragons" — is going much faster, so that one's already halfway done. Once the machine is running I'll cut the first kits and hand them to my wife for testing. :)

PS The photos show the stone nalichniki of Khvalynsk.
The wonderful local historian Alexei Naumov recently published an excellent book, Decorative Carving of Khvalynsk, with support from the Presidential Grants Foundation — and it prompted me to go back through my Khvalynsk archive and discover, to my surprise, that for such a small town I have a remarkable number of stone nalichniki on film. And what remarkable ones at that!